Work Involved

-Strip out original suite including all tiles and sanitary ware.
-Cut out floor screed and completely re-pipe to accommodate new bathroom.
-Reposition soil stack to accommodate new gas fire.
-Replace immersion heater and fit time clock.
-Fit underfloor heating.
-Replace cold water storage tanks and fit new brass pump to hot water supply.
-Prepare walls for plastering and reinforce existing studwork and fit new studwork to accommodate wall hung toilet, spa bath, gas fire and wetroom area.
-Plaster walls and fit new drop ceiling, pelmet and bulkhead complete with downlights.
-Fit new gas fire and form recess above it.
-Fit new wall hung toilet with Geberit frame and chrome flush plate.
-Form bath plinth and fit whirlpool bath with electronic controls, finished with Emperador marble.
-Fit Emperador marble floating shelves with basin.
-Fit solid Emperador shower tray in wet area with solid Emperador walls and ceiling, complete with L.E.D. rainfall drencher and solid Emperador shower seat.
-Fit Emperador architrave around door.
-Tile walls and floor.
-Fit designer radiators and chrome valves.
-All other materials and labour including bespoke mirror, plumbing, fitting glass shelves, making good etc.

Have a look around! Use your device to take a virtual 3D tour of the room below.


Project Time - 10 Days


The Process

We ensure every project is run seamlessly, effeciently and effectively...

Design

Our expert design team works together with you to design your perfect room. No matter what features or accessories you want, we can provide and incorporate them into your dream bathroom!

Supply

We then source and stock EVERYTHING from your shower, bath, basin and everything in between, right up to and including the electrical fittings, ceilings, doors etc.

Installation

Everything that has been designed and supplied is then installed by our expert team of quality trades men. All of our workers are trained and employeed in house and our average install time is 4 days.