Spare Room To Luxury Bathroom

This wasted downstairs space was transformed into an elegant luxury bath and wetroom.

Work Involved

-Strip out existing room including removing wardrobes and wallpaper.
-Build studwork and dwarf wall at shower
-Cut out screed and form wet floor shower and pipe into new sewer.
-Build studwork at bath and fit new wall hung frame.
-Tile walls and floor as discussed and fit new cimstone.
-Fit wall hung toilet.
-Install vanity unit with undermounted basins.
-Fit digital shower, radiator & shower screens.
-All other necessary materials & labour incl LED lighting c/w PIR, showerboard in Shower, joinery, plumbing, electrical and making good.

Project Time - 5 Days


Design

Our expert design team works together with you to design your perfect room. No matter what features or accessories you want, we can provide and incorporate them into your dream bathroom!

Supply

We then source and stock EVERYTHING from your shower, bath, basin and everything in between, right up to and including the electrical fittings, ceilings, doors etc.

Installation

Everything that has been designed and supplied is then installed by our expert team of quality trades men. All of our workers are trained and employeed in house and our average install time is 4 days.