Spare Bedroom to Bathroom Conversion

This spare bedroom was converted in only 3 days.

BeforeBefore      DuringDuring      AfterAfter      lightbox jquery videoby VisualLightBox.com v6.0

Work Involved

-Build out casing under window sill to accommodate bath including all necessary plumbing for taps and waste.
-Form casing for around bath and fit bath.
-Form alcove to side of bath including lighting.
-All necessary materials and labour including all underfloor plumbing directed to room, tiling, mosaic work etc.

Project Time - 3 Days


Design

Our expert design team works together with you to design your perfect room. No matter what features or accessories you want, we can provide and incorporate them into your dream bathroom!

Supply

We then source and stock EVERYTHING from your shower, bath, basin and everything in between, right up to and including the electrical fittings, ceilings, doors etc.

Installation

Everything that has been designed and supplied is then installed by our expert team of quality trades men. All of our workers are trained and employeed in house and our average install time is 4 days.